10th week..

1st day, there are less test that need to do since the project engineers doing some calculation and modification before proceed with test. Since have nothing to do, my supervisor ask to record and update location status for each items that needed e.g in-glass thermometer, which is unused, use and broke.
2nd day, proceed with equipments/items update.
3rd day, record all the data inside Microsoft Excel and saved into required destination folder.
4th day, took medical leave, fall sick because no work to do =p
5th day, tightly keep the out dated printed files, obtain all results for every tests that has been done previously to the upstairs inside the data storage room. After that, my supervisor ask me to do some research about 4 types of RTD manufactured by MATLOW. Then, proceed with disassemble 1400CFM FCU unit from TR9 and need to be installed upstairs for sound and vibration test.