1st day, assemble FCU unit type 1400CFM into TR9 to proceed with CFM test. Previously the unit has been test with original blower now some modification has been made to reduce cost and at same time want to increase the unit efficiency. After observation, the result was failed since the CFM value is lower that previous CFM with the original blower.
2nd day, take out blower and dry pan from 800CFM FCU unit to do some painting and need to review by the engineer in charge. Then I has been asked by supervisor to do research about a temperature sensor device to the the reading accuracy. Those research for the equipments is a part of preparation to do test on big AHU unit soon. So the device involve in measuring the data must be high in accuracy to get the great result.
3rd day, no test to do and I was helping Mr. Bakri to service 6 units of air-conditioning inside and outside lab. Then proceed with update equipment and maintenance sheet for June.
4h day, really didn't have any things to do and I took half day since I have several personal matters to do.
5th day, the day that Visitor come to my place, to visit and evaluate my internship programme. Meeting my supervisor and officers in the lab to ask how I am doing along this 3 months time. My visiting lecturer is Mr. Saiful Hasmady and before the session end, I could explain to him about what I have did and examples of the results of laboratory tests. I also shared the knowledge I gained from this internship programme.
Subscribe to:
Post Comments (Atom)

No comments:
Post a Comment