9th week.

I took leave on Monday since have something to do with my PTPTN agreement and came back to work on Tuesday.
2nd day, assigned by the supervisor to disassemble the 1000CFM FCU unit inside the TR9 and need to replace with 1400CFM FCU unit to proceed with CFM test. It came without top sheet metal drain pan so we need to equip it like original assemble so that can do comparation with previous test that has been done in 2009. Procedures for CFM test remain the same, which is 3 different speed, (High, Medium and Low Speed).
3rd day, change the front panel of the unit with opening panel without grill and run CFM test again to obtain the results.
4th day, set up the unit for next test, System Cooling Test. For this test, we need to assemble like the original which is equip the unit with previous panel with grill. Welding the pipe channel for water in and water out.
5th day, assigned by the supervisor to update data for the all things inside the lab.
e.g : 1) Suggestion list to update equipments inside lab. Benchmarking and remarks suggestion items that has been done.
2) Consists of price & description for each items/equipments.